Frist abgelaufen

BME EEA 2026-15 Framework agreement for the operation of municipal electric vehicle chargers in Bergen

Die Angebotsfrist ist am 02. November 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓
Auftraggeber
Veröffentlicht
01.10.2026
Angebotsfrist
02.11.2026
Bergen Municipality, through the Agency for Urban Environment, needs to enter into a framework agreement with one supplier for the operation and maintenance of the municipality's electric vehicle charging stations. The procurement covers the operation and maintenance of electric vehicle chargers and electrical installations connected to charging stations managed by the Agency for Urban Environment. This concerns public chargers at public parking facilities, chargers reserved for car-sharing, and chargers connected to residential parking-zone facilities managed by the Agency for Urban Environment.

Zeitplan

Veröffentlichung
01.10.26
Abgabefrist
02.11.26
Vertragsbeginn
27.11.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Vertragsart
Rahmenvereinbarung
Geschätzter Wert
4.000.000 NOK
Erfüllungsort
Bergen, Deutschland
E-Mail
hovedpostmottak@bergen.kommune.no
Telefon
+47 05556
Website
https://www.bergen.kommune.no/
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • For services only

    • •For services only: In the reference period, the supplier has carried out the following main deliveries of the type sought, or has provided the following main services of the type sought. The contracting authority may require up to three years of experience and may take into account experience from before the most recent three years.
    • •Minimum requirement for qualification
    • •The supplier must have good and relevant experience. The experience must include deliveries of a complexity relevant to the delivery requested in this procurement. This entails, as a minimum: operation and maintenance of charging stations, including fleet experience of at least 30 chargers.
    • •eCertis
    • •No eCertis data available.
    • •Documentation requirements:
    • •Relevant experience must be documented by providing a minimum of 1 reference project and a maximum of 5 reference projects from the last 5 years. At least 1 of the references must have a duration of at least 6 months.
    • •If more than five reference projects are submitted, only the first five will be assessed. The contracting authority will carry out an overall assessment of the reference projects to determine whether the supplier meets the qualification requirement. The reference projects may complement each other.
  • Technical facilities and quality assurance measures

    • •The supplier applies the following technical facilities and quality assurance measures, and the supplier's study and research facilities are as follows:
    • •Minimum requirement for qualification
    • •The contracting authority requires that all suppliers have implemented a quality management system that is satisfactory to ensure the quality of performance under this contract.
    • •eCertis
    • •No eCertis data available.
    • •Documentation requirements:
    • •A description of the company's implemented quality management system. A certificate of the company's quality management system, issued by independent bodies confirming that the company complies with certain quality management standards, for example ISO 9001, must be submitted.
    • •If the company does not hold such a certificate, other documentation of the company's quality management system must be submitted.
    • •In such cases, the following must be submitted as a minimum:
    • •the name of the system and a detailed table of contents
    • •an overall description of the content of the system, including an overview of control plans and checklists relevant to this contract
    • •a description of the division of responsibilities within the quality management system
    • •a description of procedures for internal control and non-conformity handling (work on corrective and preventive measures)
    • •a description of how the system will be used to ensure the quality of performance under this contract.
    • •All documentation submitted or obtained will form the basis for an overall assessment of whether the qualification requirement is met.
  • Enrolment in a trade register or company register

    • •The supplier is registered in a trade register or company register in the Member State in which the supplier is established. As described in Annex XI to Directive 2014/24/EU
    • •economic operators from certain Member States may have to comply with other requirements set out in that Annex.
    • •I. Enrolment in a trade register (Regulations Regarding Public Procurement FOR-2016-08-12-974 § 16-2 (1) [https://lovdata.no/dokument/SF/forskrift/2016-08-12-974 [https://lovdata.no/dokument/SF/forskrift/2016-08-12-974]] [https://lovdata.no/dokument/SF/forskrift/2016-08-12-974%5D])
    • •It is enrolled in trade registers kept in the Member State of its establishment as described in Annex XI of Directive 2014/24/EU
    • •economic operators from certain Member States may have to comply with other requirements set out in that Annex.
    • •Certificate of registration [https://ec.europa.eu/tools/ecertis/#/evidence/detail/22342?lang=no [https://ec.europa.eu/tools/ecertis/#/evidence/detail/22342?lang=no]] [https://ec.europa.eu/tools/ecertis/#/evidence/detail/22342?lang=no%5D]
    • •Issued by: The Brønnøysund Register Centre
    • •Documentation requirements:
    • •Minimum requirement for qualification
    • •The supplier must be a lawfully registered undertaking.
    • •Documentation: Suppliers registered in the Norwegian Central Coordinating Register for Legal Entities do not need to submit documentation. The contracting authority will verify the registration using the organisation number provided in the supplier's profile in Artifik. Suppliers not registered in the above-mentioned register must submit a certificate or confirmation (equivalent to a certificate of registration) of registration in a trade register or company register as prescribed by the legislation of the country in which the supplier is established. Such certificate must not have been issued more than 6 months before the deadline for submission of tenders.
  • Environmental management measures

    • •The supplier may apply the following environmental management measures in connection with the performance of the contract:
    • •The contracting authority requires that the supplier has routines and systems in place that ensure a low environmental impact in the performance of the delivery.
    • •eCertis
    • •No eCertis data available.
    • •Documentation requirements:
    • •If the supplier holds third-party certification under ISO 14001, Eco-Lighthouse (Miljøfyrtårn), EMAS or similar, the certificate must be enclosed with the tender. If the company does not hold such third-party certification, the following must be submitted as a minimum:
    • •The name of the system
    • •an overall description of the content of the system, including an overview of control plans and checklists relevant to this contract
    • •a description showing the division of responsibilities within the environmental management system
    • •a description of procedures for internal control and non-conformity handling
    • •It is preferred that the documentation be compiled into 1 pdf named "Environmental management documentation". All documentation submitted or obtained will form the basis for an overall assessment of whether the qualification requirement is met.
  • Other economic and financial requirements

    • •With regard to any other economic and financial requirements set out in the notice or in the procurement documents, the supplier declares that:
    • •Minimum requirement for qualification
    • •The supplier has sufficient economic and financial capacity to fulfil the agreement. The required economic capacity is assessed in relation to the value, performance, risk and duration of the agreement. All information submitted and, where applicable, obtained will form the basis for an overall assessment of whether the qualification requirement is met.
    • •eCertis
    • •No eCertis data available.
    • •Documentation requirements:
    • •The contracting authority will check the credit rating carried out by the credit agency Creditsafe. The supplier does not need to submit its own credit rating. Newly established suppliers may submit a bank statement as evidence of creditworthiness. Foreign companies: the contracting authority will itself check the supplier's economic situation via Creditsafe (https://www.creditsafe.com [https://www.creditsafe.com]).
    • •If the supplier is not registered in Creditsafe's registers, the company's two most recent audited annual accounts must be submitted upon request. If the information in the sources above is not correct, or supplementary information is needed to clarify the company's economic and financial situation, this may be submitted.

Zuschlagskriterien

  • Price

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen