The provision of highway related construction works and associated services comprising capital-funded maintenance and improvement schemes, delivered in accordance with Buckinghamshire Council's asset management strategy to enhance the operation and maintain the serviceability of the highway asset and include, without limitation: This Procurement is being conducted to establish an Open Framework Scheme in accordance with Section 49 of the Procurement Act 2023. The maximum total duration of this Open Framework Scheme—including all successive framework agreements awarded under it—shall be eight (8) years from the commencement date of the initial framework agreement. The Framework is divided into seven (7) discrete Lots. It is the Contracting Authority’s intention to appoint a maximum of four (4) suppliers to each individual Lot at any given time.
7 Lose

Zeitplan

Veröffentlichung
21.11.26
Fragenfrist
15.12.26
Teilnahmefrist
23.12.26
Vertragsbeginn
01.04.27

Ausschreibung

Reichweite
EU-weit
Vergabeart
oth-mult
Vertragsart
Rahmenvereinbarung
Zuschlagskriterien
Qualität 100%
Geschätzter Wert
126.030.000 £
Erfüllungsort
Aylesbury, Deutschland
KMU geeignet
Ja
E-Mail
procurement@buckinghamshire.gov.uk
Telefon
01296395000
Website
https://www.buckinghamshire.gov.uk/
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Financial capacity conditions of participation

    • •As detailed within FW1 Stage 1 PSQ - 01. Annex 01 – PSQ Guidance, bidders must provide all of the information necessary to facilitate the assessment
    • •and pass the Council’s minimum level of economic and financial standing. The overall weighted scores for all the Areas are added together to achieve a total weighted score for all the Areas. The total weighted score achieved for all the Areas must be a total weighted score of no less than 45% to pass the financial standing tests.
    • •Bidders are required to commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:
    • •a. Employer’s (Compulsory) Liability Insurance = £20m
    • •b. Public Liability Insurance = £20m
    • •c. Professional Indemnity Insurance = £5m
  • As detailed within FW1 Stage 1 PSQ - 01. Annex 02 – PSQ Form

    • •Q21 and Q22: Relevant experience and contract examples
    • •Q23: Key Personnel & Delivery Team
    • •Q24: Health & Safety Policy
    • •Q25: General Data Protection
    • •Q26: Net Zero 2050
    • •The Council intends to identify a maximum of six (6) Suppliers to invite to participate in Stage 2 for each Lot and a minimum of 4 Suppliers per Lot but reserves the right to invite less if there are not sufficient eligible Suppliers to meet that minimum number.
    • •If there are fewer than six (6) Suppliers expressing interest in the procurement and/or fewer than six (6) Suppliers passing PSQ stages, the Council reserves the right to either abandon this procurement or continue with fewer Suppliers provided the Council is satisfied there are sufficient Tenderers to ensure genuine competition.
    • •The Council reserves the right to invite up to one (1) additional Supplier where scores are equal to, or very close to, the score of lowest ranked Shortlisted Supplier, i.e. the Supplier ranked in third position. This will apply, therefore, where there is less than a one percent (1%) difference in the total weighted score between the third and fourth placed Suppliers pursuant to Stage 3 of the PSQ.

Zuschlagskriterien

  • Price Assessment Criteria

    • •The Price Score for Framework 1 – Highways works accounts for 60% of the assessment. The price assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents. The Pricing Schedule will be assessed by a Council Officer (assessor) who is not a member of the Quality Assessment Panel. The Price Score will be calculated as set out below.
    • •Price Score = (Lowest Evaluated Price / Bidder's Evaluated Price) x 60%
    60%
  • Quality assessment criteria

    • •The Quality Score for Framework 1 – Highways Works accounts for 40% of the assessment. The quality assessment methodology is contained within Annex 03 Award Criteria and Assessment Methodology, which has been published within these documents.
    • •The assessment criteria is as follows.
    • •1 Collaboration & NEC4 Delivery Model 20%
    • •2 Technical Capability & Relevant Experience 35%
    • •3 Service Delivery & Performance Management 35%
    • •4 Innovation, Continuous Improvement & Digital Delivery 5%
    • •5 Social Value 2.5%
    • •6 Sustainability & Environmental Impact 2.5%
    • •Once the scores for each section have been awarded the total quality score will be out of 100%. This will be converted into 40% using the following calculation:
    • •Score/100 x 40 = Total quality score
    40%

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (7)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen