Frist abgelaufen

Contract Administration and Construction Supervision of the Pipe Conveyor from Telal AlThahab to the downstream location on King Abdallah Canal, at Turnout 95

Die Angebotsfrist ist am 08. Juli 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓
The Services to be carried out by the Consultant shall entail provision of assistance to the Client in Contract Administration and Construction Supervision for the Works contract: Construction of Main Conveyor from Telal Al Thahab to the Downstream Location on King Abdullah Canal at Turnout 95.

Zeitplan

Veröffentlichung
26.05.26
Abgabefrist
08.07.26
Öffnung
08.07.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Geschätzter Wert
4.700.000 €
Erfüllungsort
Amman, Deutschland
Vertragslaufzeit
54 Tage
E-Mail
Haya_alghzawi@mwi.gov.jo
Telefon
00
Website
http://www.mwi.gov.jo

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Description of selection criterion

    • •Financial Capacity: The Applicants shall demonstrate the following capacity as specified in Section 2, and comply with the minimum requirements stated below: Minimum average annual turnover for the previous five (5) years (20202024) equivalent to one million Five Hundred Thousand euro (EUR
    • •1,500,000). Minimum Average Current Ratio ˃ 1.1 for the last five years (20202024). In the case of a JVCA, all members combined must satisfy the Financial Capacity requirement Each member of a JVCA shall meet not less than 40% of the turnover requirement, while the leading member shall meet not less than 60% of the turnover
    • •requirement. Each member of a JVCA shall meet the current ratio requirement.
  • Description of selection criterion: General Experience: The Consultant shall meet the following minimum criteria and shall demonstrate it in the specified form in Section 2: Successful experience as sole consultant, leader of a consortium, or consortium member in the execution of three (3) individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for administration and construction supervision of works contracts. The value of each of the works contracts (for which contract administration and construction supervision services were provided) shall have been at least 25 million EUR. In the case of a JVCA, all members combined must satisfy the Criterion (a). Each member of a JVCA shall demonstrate experience of at least one (1) of the aforementioned three contracts.

  • Description of selection criterion

    • •Specific Experience: The Consultant shall meet the following minimum criteria and shall demonstrate it in the form TECH6 specified in Section 2: Successful experience as sole consultant, leader of a consortium, or consortium member in the execution of at least two (2), but no more than three (3),
    • •individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for the Contract Administration and Supervision of construction of water pressure transmission pipelines and within which (contracts combined), the construction of at least 30km length of pipeline of diameter at least 600mm shall have been supervised. Each associated work contract shall have comprised no less than 3km of pipeline. Taking Over Certificates or similar certificates of substantial completion shall have been issued for each associated works contract. In the case of a JVCA, all members combined must satisfy the above Criterion. The leading member of JVCA shall demonstrate experience of at least one (1) of the aforementioned contracts and within which the construction of at least 10km of pipeline was supervised. Successful experience as sole consultant, leader of a consortium, or consortium member in the execution of two (2) individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for the Contract Administration and Supervision of construction of riverine structures such as intakes, dams, bridges with foundations within the bed, weirs, embankments, bed regulation and the like. The value of each contract brought as a reference shall be at least 500,000 EUR. Contracts where such riverine structures formed part of the Works shall be considered where the value of the riverine structures can be demonstrated to have been at least 500,000 EUR. Taking Over Certificates or similar certificates of substantial completion shall have been issued for each associated works contract. In the case of a JVCA, all members combined must satisfy the above Criterion. The leading member of a JVCA shall demonstrate experience of at least one (1) of the aforementioned two contracts. Successful experience as sole consultant, leader of a consortium, or consortium member, in the execution of two (2) individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for Contract Administration and Supervision of construction works, which were governed by either the Red FIDIC Books Conditions of Contract for Construction (1999 or 2017 editions) or the Yellow FIDIC Books Conditions of Contract for Plant and Design-Build (1999 or 2017 editions). The value of each of these works contracts shall have been at least 10 million EUR. In the case of a JVCA, all members combined must satisfy the above Criterion. The leading member of a JVCA shall demonstrate experience of at least one (1) of the aforementioned two contracts. Successful experience as sole consultant, leader of a consortium, or consortium member, in the execution of one (1) individual contract, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for Contract Administration and Supervision of construction, carried out in the MENA region. In the case of a JVCA, all members combined must satisfy the above Criterion. The leading member of JVCA shall demonstrate experience of at least one (1) of the aforementioned contracts and within which the construction of at least 10km of pipeline was supervised.
    • •- Successful experience as sole consultant, leader of a consortium, or consortium member in the execution of two (2) individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for the Contract Administration and Supervision of construction of riverine structures such as intakes, dams, bridges with foundations within the bed, weirs, embankments, bed regulation and the like. The value of each contract brought as a reference shall be at least 500,000 EUR. Contracts where such riverine structures formed part of the Works shall be considered where the value of the riverine structures can be demonstrated to have been at least 500,000 EUR. Taking-Over Certificates or similar certificates of substantial completion shall have been issued for each associated The leading member of a JVCA shall demonstrate experience of at least one (1) of the aforementioned two contracts.
    • •- Successful experience as sole consultant, leader of a consortium, or consortium member, in the execution of two (2) individual contracts, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for Contract Administration and Supervision of construction works, which were governed by either the Red FIDIC Books Conditions of Contract for Construction (1999 or 2017 editions) or the Yellow FIDIC Books Conditions of Contract for Plant and Design-Build (1999 or 2017 editions). The value of each of these works contracts shall have been at least 10 million EUR.
    • •In the case of a JVCA, all members combined must satisfy the above Criterion.
    • •The leading member of a JVCA shall demonstrate experience of at least one (1) of the aforementioned two contracts.
    • •- Successful experience as sole consultant, leader of a consortium, or consortium member, in the execution of one (1) individual contract, completed within the ten (10) year period prior to the deadline for submission of the Proposal, for Contract Administration and Supervision of construction, carried out in the MENA region.
    • •In the case of a JVCA, all members combined must satisfy the above Criterion.
    • •works contract.
    • •In the case of a JVCA, all members combined must satisfy the above Criterion.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen