EPCI Offshore Platforms for the Ostwind 3 and Gennaker Projects

Auftraggeber
Veröffentlicht
09.06.2021
Angebotsfrist
12.07.2021
Contracting of the design, engineering, construction, supply, installation, and commissioning of 220kV AC Offshore Substations for the Ostwind 3 and Gennaker projects in the Baltic Sea. More detailed scope description is provided under the 'GOP-OSS-3AA-00-C-01-GOP Procurement Scope Description' document (provided with the tender package). The tender will result in the award of a framework agreement to the tenderer ranked first (‘Core Contractor’), second (‘Back-up Contractor 1’) and third (‘Back-up Contractor 2’) in the award decision. If less than 3 submitted binding bids are compliant, the Contracting Entity can award a framework agreement to a fewer amount of tenderers.
Vergabeunterlagen

Zeitplan

Veröffentlichung
09.06.21
Abgabefrist
12.07.21

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Berlin, Deutschland
Vertragslaufzeit
48 Tage
E-Mail
thomas.vanhoye@externel.be
Freischalten
Telefon
+32 489787820
Freischalten
Website
https://www.50hertz.com/
Freischalten

Eignungs- & Bewertungskriterien

KI-Kriterien-Analyse

Erfüllen Sie die Anforderungen?

KI-Analyse prüft Eignungskriterien gegen Ihr Unternehmensprofil

Eignung prüfen

Kostenlos · Sofortige Analyse

Lose (1)

Eigenerklärung24 KB16 Seiten
Eignungskriterien156 KB32 Seiten
Preisblatt78 KB2 Tabellen
Projektplan37 KB12 Seiten
+ 4 weitere Dokumente

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vollständige Vergabeunterlagen herunterladen
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Mein Suchprofil erstellenKostenlos · Keine Kreditkarte

Vertraut von 1.000+ Unternehmen

Roland BergerE.ONPPLWise

Nie wieder passende Ausschreibungen verpassen

Suchprofil erstellen