Operational control water and sewage.

Die Angebotsfrist ist am 19. August 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓
Auftraggeber
Veröffentlicht
22.07.2026
Angebotsfrist
—
The procurement is for the procurement of a new operational control plant for all water and sewage installations in Fredrikstad municipality. In addition a framework agreement will be signed for the delivery of new PLC installations, upgrading PLS installations at existing stations, work in connection with changes/additions to the operations control plant and automation work on other installations within water and sewage. A maintenance agreement will also be signed for operation control installations, as well as new and existing PLS installations in the municipality. See the procurement documents for further information.

Zeitplan

Veröffentlichung
22.07.26
Teilnahmefrist
19.08.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Vertragsart
Rahmenvereinbarung
Geschätzter Wert
30.000.000 NOK
Erfüllungsort
FREDRIKSTAD, Deutschland
Vertragslaufzeit
120 Tage
E-Mail
eirik@odinprosjekt.no
Telefon
+47 90063037
Website
https://odinprosjekt.no/
In Maps öffnen

Eignungs- & Bewertungskriterien

Zuschlagskriterien

  • Price: Completed price forms Annex 4.1, Annex 4.2 and Annex 4.3.

  • Quality

    • •The contracting authority will emphasise more fulfilment of the S/M requirements as well as fulfilment of B-requirements within the following points:
    • •From SSA-T – Operations Control System:
    • •o System architecture (topology) (Annex 1, Chapter 5, 5.2, 5.3)
    • •o User interface with examples of monitor images, operation and time response (Annexes 1, Chapters 5.5 and 5.6).
    • •o Alarm system (Annex 1, Chapter 5.7)
    • •o Historical storage and trend system (Annex 1, Chapter 5.8)
    • •o Report System (Annex 1, Chapter 5.9)
    • •o Functions (Annex 1, Chapter 5.10)
    • •o Information security (including any certifications) (Annex 1, Chapter 5.4).
    • •From The Framework Agreement Automation, Technical Description
    • •o The offered PLS equipment with programming tools (Chapter 4).
    • •From SSA-V - Maintenance Contracts
    • •o The contracting authority ́s requirement specifications, annex 1
  • Competence: An evaluation will also be made on fulfilment of the minimum requirements stated, cf. the tender documentation annex 1.2 SSA-T, Annex 1 Point 8.3 Personnel Requirements.

  • Implementation plan

    • •The detailed description delivered in annex 2 will be evaluated with a particular focus on:
    • •o Described implementation plan
    • •o Progress plan
    • •o Dealing with deviations, up to and including the delivery day.
    • •o Interaction
    • •The contracting authority will particularly emphasise realistic plans including considerations to time and resources, as well as routines for processing deviations. Particular emphasis will be put on cooperation with the customer.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen