Tender of Head-End System for Gotlands Elnät

Zuschlag erteilt am 28. Oktober 2026

  • A Metering AB, Östersund · 12.000.000 €
Auftraggeber
Veröffentlicht
28.10.2026
Bekanntmachungsart
Zuschlagsbekanntmachung
The Customers’ smart meters, supplied by Ningbo Sanxing Smart Electric Co.,Ltd. and EMH metering GmbH & Co. KG, cover categories 1–5 and include advanced features beyond the new functionality requirements introduced 2025 January 1st (accordingly to Swedish legislation (SFS 1999:716)), such as extensive power quality measurements (up to 80 series per device). Collection is primarily done by push technology via mobile networks. The number of meters total around 46,000 with the main bulk being Sanxing models and the total number of measurement series collected is around 2,3 million. Due to the expiration of the current Head-End System (HES) supplier agreement, a new procurement of HES is required. The new HES must have existing functionality that support the Customer’s meter models (Sanxing S34U18 (3PH DC and CT), Sanxing S12U18 (1PH DC) and EMH-LZQJ-XC (CT)). The Tenderer must also be able to implement functionality for the new EMH-LZQJ-SGM (CT) if not already supported by the new HES.

Zeitplan

Veröffentlichung
28.10.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Geschätzter Wert
15.000.000 SEK
Erfüllungsort
Visby, Deutschland
E-Mail
info@geab.se
Telefon
0498 - 28 50 00
In Maps öffnen

Eignungs- & Bewertungskriterien

Zuschlagskriterien

  • Requirements (functional, non-functional and security “should”-requirements) with demo – Maximum deduction

    • •SEK 2,250,000 from the tender price is divided
    • •into fulfillment of should-requirements and the performance of the demosession. If the tender meets all should-requirements, the maximum deduction is
    • •SEK 1,131,000.
    • •• The Customer will assess the Tenderer’s demo-session, with a maximum
    • •deduction of SEK 1,119,000.
    • •• Implementation project – maximum deduction SEK 900,000 from the tender price
    • •Confidentiality: C2 - Internal
    • •• Sustainability (see Appendix F Sustainability requirements questionnaire for the
    • •should-requirements) – maximum deduction SEK 450,000 from the tender price.
  • Price – The tender’s total offered price (estimated TCO for 8 years of contract)

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen