Statsbygg would like, in connection with project 1148703 NTNU Campussamling - Sub-project 1148712 P6 HUMSAM, to implement a qualification process for participants who may be interested in submitting tenders for a turnkey contract with interaction. Note that the competition will be held in two stages after the procedure "Negotiated Procedure". P6 HUMSAM is a university building/purpose built building. Features of the building include a joint learning district for 1st - 3rd year students, learning areas for 4th - 5th years students, teaching areas, special areas and workplace areas. The functions in the building also include hub and joint functions. The project has an area of approx. 34,000 m2 GFA. The contract includes demolition of the existing Berg building, Metalllurgi and Development of the site, totalling approx. 14,000 m2 GFA. The contract also includes neighbouring outdoor and infrastructure work. Contract P6 HUMSAM shall be carried out as a turnkey contract with interaction. The interaction model is generally divided into 2 main phases, with further maturation, development and planning occurring in interaction phase 1 and detailed engineering design services for and construction in collaboration phase 2. See the attached procurement documents for more detailed information.

Zeitplan

Veröffentlichung
12.11.26
Teilnahmefrist
14.12.26
Vertragsbeginn
04.05.27

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Oslo, Deutschland
E-Mail
postmottak@statsbygg.no
Telefon
+47 22954000
Website
https://statsbygg.no

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Organisational and legal position

    • •Tenderers are required to have a legally established company.
    • •Documentation requirement:
    • •Company Registration Certificate, alternatively StartBANK ID.
    • •Foreign companies are required to have an equivalent certificate as prescribed by the laws of the country where the business is registered.
  • Economic and financial capacity

    • •Tenderers are required to have sufficient economic and financial implementation ability.
    • •As a minimum requirement:
    • •For Contractors: Equity share greater than 15% and annual turnover of minimum NOK 1,000,000,000 on average in the last 3 years.
    • •Documentation requirement:
    • •The Directorate of Public Construction and Property will carry out a credit rating of tenderers.
    • •Tenderers shall, in addition, submit auditor confirmed annual accounts for the years 2023 to 2025.
  • Technical and professional qualifications

    • •Tenderers are required to have experience with having contract responsibility for assignments with a transferable value to project P6.
    • •At least one of the reference assignments had a contract value of more than NOK 750 million. NOK 200,000,000 (excluding VAT), and at least one of them shall have been a partnering contract with a contract value of more than NOK 500 million (excluding VAT).
    • •Interaction means that the contract was carried out with phase 1 project development and phase 2 implementation.
    • •Documentation requirement:
    • •Up to four reference assignments shall be documented.
    • •The reference assignments shall have been carried out in the last 10 years. The planned completion must be at the latest in 2027.
    • •The reference assignments shall be documented by completing the attached template for reference projects.

Zuschlagskriterien

  • K1: Price

  • K2: Quality in the execution of the interaction phases - assignment comprehension.

  • K3: Competence and experience of offered key personnel - offered team of key personnel's collaboration and interaction competence.

    • •The Directorate of Public Construction and Property believes that the terms to use the exclusion provisions in the PPR § 5b second paragraph of the third period are met, as comprehensive requirements have been made in the project ́s environmental follow-up plan that ensures that the climate and environmental impact of the procurement is addressed in the execution of the contract. As the project shall mature and be developed in a collaboration, tenderers do not have the same possibilities to offer binding systems with certain environmental properties already at the tender stage. Several requirements have therefore been set that ensure that climate and environmental considerations are assessed and taken into account in the implementation of the project. Based on this, Statsbygg believes that a better climate and environmental effect will be achieved by using this requirement position than by the use of award criteria, cf. the Public Procurement Regulations § 5b second paragraph, third period.
    • •The Directorate of Public Construction and Property is therefore exempted from the obligations to emphasise the environment or to prioritise the environment among the three highest prioritised award criteria.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen