Frist abgelaufen

Arctanderbyen part 2

Die Angebotsfrist ist am 08. Mai 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓
Auftraggeber
Veröffentlicht
03.04.2026
Angebotsfrist
—
The project will replace ingrown water pipelines, upsizing Ø125 water pipelines and separation of manholes. Parts of the sewage network shall be separated and upgraded. Surface water pipes are also to be established for handling surface water from Ekebergsletta and Ekebergskrenten. We would like some different methods for renovation of the project. See the requirement specification and the accompanying annexes.

Zeitplan

Veröffentlichung
03.04.26
Teilnahmefrist
08.05.26
Vertragsbeginn
10.07.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Oslo, Deutschland
E-Mail
postmottak@vav.oslo.kommune.no
Telefon
+47 21802180
Website
https://www.oslo.kommune.no/etater-foretak-og-ombud/vann-og-avlopsetaten/
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • 4.2.1 Requirements regarding the tenderer ́s registration, authorisations etc.

    • •The tenderer shall be a legally established company.
    • •Documentation requirements:
    • •Norwegian companies: Company Registration Certificate. NB: The contracting authority will obtain company registration certificates from the brreg.no
    • •Foreign companies: Proof that the company is registered in a trade or business register as prescribed by the law of the country where the company is established.
  • 4.2.2 Requirements regarding the tenderer's economic and financial capacity.

    • •The tenderer must have sufficient financial capacity to carry out the contract.
    • •Documentation requirements:
    • •·         Credit evaluation/rating, not older than 3 months, and which is based on the last known fiscal figures. NB: The contracting authority will obtain a credit rating from CreditSafe.
    • •And/or:
    • •·         The company's annual accounts or extracts thereof if the publication of the annual accounts is required in the country where the tenderer is established. NB: Norwegian companies can obtain the annual accounts for Norwegian companies from brreg.no. Foreign companies can refer to an equivalent place where the contracting authority can obtain the annual accounts without costs.
  • 4.2.3 Requirements regarding the tenderer ́s technical and professional qualifications.

    • •·         Good experience is required from equivalent work.
    • •Equivalent work means excavation, blocking out and hose renovation in confined densely populated areas.
    • •It will be positive if the tenderer has water stocking experience, but this is not a requirement.
    • •Documentation requirements:
    • •An overview of the construction work that the tenderer has carried out in the last five years.
  • 4.2.3 Requirements regarding the tenderer ́s technical and professional qualifications.

    • •Tenderers shall have quality assurance measures suited to the content of the contract.
    • •Documentation requirements:
    • •·         A description of the tenderer's quality assurance measures.
    • •·   If a tenderer is certified iht. ISO 9001 or equivalent quality assurance standards, it is sufficient to present a copy of a valid certificate.
  • Qualification requirements connected to due diligence assessments for responsible working life.

    • •Tenderers shall be suitable to fulfil the contractual requirements for due diligence assessments for responsible businesses within 3 months from the signing of the contract.
    • •This means that the Tenderer has implemented measures and systems that are used in the Tenderer's work to safeguard basic human rights and decent working conditions, as well as to prevent environmental degradation and corruption.
    • •Documentation requirements:
    • •A description of the tenderer's systems for working with due diligence assessments in accordance with the UN ́s guiding principles for business and human rights (UNGP) and OECD ́s guidelines for multinational companies. The documentation shall include:
    • •·         Formal policy/guidelines that cover an obligation to comply with the requirements of responsible business.

Zuschlagskriterien

  • Price

  • The offered implementation

  • Environment

    • •According to the Supply Regulations § 7-9 (2), the Contracting Authority shall emphasise climate and environment considerations with a minimum of 30% in the award criteria. There is, however, an opportunity to depart from this main rule if it is "clear that" the climate and environmental requirements in the requirement specifications provide a better climate and environmental effect, and this is justified in the procurement documents, cf. the utilities regulation § 7-9 (4) first period.
    • •There are minimum requirements in this procurement in accordance with Oslo municipality ́s standard climate and environmental requirements, including requirements for emission free construction sites and requirements for fuel technology for other transport. These are in the tender documentation annex 2 contract formula NS 8405 point 22.
    • •It is clear that these requirements give a better climate and environmental effect than weighting climate and environmental considerations with a minimum of 30% in the award criteria. I.a. due to conditions stated in the following.
    • •The machines where there are no requirements that shall carry out the work emission free, shall use a minimum of euro class 6/VI and documented sustainable biofuels beyond the turnover requirements.
    • •The lower threshold is biogas by transporting matter respectively and by other transport by vehicles under 3.5 tons.
    • •Other transport by vehicles over 3.5 tonnes, as a minimum, it is to use fossil free vehicles for transport that as a minimum fulfil euro class 6/VI. Bio-fuel used in the implementation of the contract shall be documented sustainable biofuels beyond the turnover requirements. By 1.1.2027, all vehicles used in the implementation of the contract must be emission free or biogas based.
    • •In addition, climate and environmental effects are taken care of by choosing excavation free methods for rehabilitation for parts of the project, which is more consistent in the requirement specifications.
    • •However, VAV would like to award tenderers who can offer climate-friendly solutions beyond the minimum requirements, and will therefore weight climate or environmental considerations by 10%. This represents an overfilling of the procurement regulations ́ requirements for taking care of climate and environmental effects.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen