Frist abgelaufen

Brundalsforbindelsen - K1 Road Works

Die Angebotsfrist ist am 18. März 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓

Zuschlag erteilt am 19. August 2026

  • Søbstad as, Tiller · 307.732.568 €
Zur Zuschlagsbekanntmachung →
Auftraggeber
Veröffentlicht
17.02.2026
Angebotsfrist
—
The Norwegian Public Roads Administration Development invites tenderers, on behalf of Trondheim municipality, to a competition with negotiations for the following contract work: K1 Road Works Brundalsforbindelsen is an environmental package project in Trondheim municipality, regulated in area development for Øvre Rotvoll, approved by the city council 20 May 2021 (case 90/21). A complete certificate must be established before the development at Øvre Rotvoll can be given. The objective of the plan is to facilitate a good and dense residential area with meeting places, function mixing and public services. The plan opens for approx. 1,500 residences, one local centre, two nurseries and sports facilities including a district pool. The Brundal connection, blue-green structures, cultural monuments and central elements of the cultural landscape are also included in the plan. The project includes an approx. 40 m long foot and cycle bridge. It is a significant volume of concrete walls. There is a significant amount of water and sewage work that shall be carried out in this contract and Trondheim municipality ́s water and sewage norms are followed here. There is also considerable district heating work that shall be carried out and coordinated with Statkraft varmes ́s contractor. A waste suction facility shall be established for a future new development where the main routes are laid in streets. There will also be significant electrical works as well as safeguarding existing cables and new installations for streets and future houses, where the work will be carried out in co-operation with Tensio.

Zeitplan

Veröffentlichung
17.02.26
Teilnahmefrist
18.03.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Trondheim, Deutschland
Vertragslaufzeit
28 Tage
E-Mail
postmottak@trondheim.kommune.no
Telefon
72540000
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • The contractor shall be a legally established company or consist of a community of contractors who are legally established companies. The requirement also applies to entities that the contractor will use, cf. point 4.1 below. The contractor shall not be a unit affected by the ban in the sanctions regulations of Ukraine § 8n, nor should it rely on entities in violation of § 8n. Documentation requirement

    • •1. Certificate from the Register of Business Enterprises or an equivalent certificate of statutory registration in the country where the contractor or the entities that will jointly constitute the contractor, cf. B2 point 4.2, has been established, as well as an equivalent certificate for all entities that the contractor will use to be qualified, cf. B2 point 4.1.
    • •2. Completed table in chapter E1 point 3.2, possibly completed points 3.3 and 3.4.
    • •3. A completed self-declaration on the relation to applicable sanctions law, cf. E1 point 3.6.
    • •4. Upon request from the builder, the contractor shall document who are real right holders in the contractor, companies in the contractor's group or companies that the contractor has controlling ownership or authority in, companies that the contractor will use, contractors and any other in the supplier chain, as well as information on who is the general manager, chairman and other senior employees at the contractor.
  • Tenderers shall have sufficient economic and financial capacity to fulfil the contract, and shall also fulfil the following requirements

    • •1. Tenderers shall have equity of minimum NOK 40 million.
    • •2. Tenderers shall have an equity ratio of at least 10%.
    • •3. Tenderers shall have an average annual turnover of minimum NOK 250 million in the last three financial years.
    • •Documentation requirement:
    • •1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers.
    • •2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. The account shall also include any events of significance that have occurred after the last revised annual accounts.
    • •3. An overview of any recently executed, ongoing or pending tax or public reviews of the contractor's activities.
    • •4. Completed table in chapter E1 point 4.
    • •If the contractor has a justifiable reason for not submitting the documentation that the builder has demanded, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/economy and which the builder deems suitable. The contractor shall justify why he cannot present the documentation the builder has demanded.
  • Tenderers shall have sufficient experience of a relevant nature and degree of difficulty, including from the following central works

    • •• Road/street building in urban areas.
    • •• Construction of concrete bridge constructions
    • •• Construction of municipal water and sewage installations.
    • •• Work by/along busy roads
    • •Tenderers shall themselves have experience from the execution of the central work as mentioned above. If the tenderer only has experience from, for example, managing contract helpers, the tenderer must rely on other entities who have the necessary experience from carrying out the relevant central work, see B2 point 4.1.
    • •Documentation requirement:
    • •1. A list of up to 8 and not less than 3 contracts that the contractor has carried out or are carrying out during the last five years calculated from the deadline for submitting requests for participation in the competition. The minimum and maximum limit applies to the total number of reference projects, and is the same regardless of whether the tenderer fulfils the qualification requirement alone or relies on others to fulfil the qualification requirement. The listed reference projects shall together document fulfilment of the qualification requirement. The list shall, cf. the form included in chapter E1 point 5.1, contain the following for each of the contracts:
    • •• Name of the recipient (contracting authority)
    • •• A description of what the contract work was like, including relevance to the qualification requirement.
    • •• What work was carried out by the contractor himself and what work was carried out by sub-suppliers.
    • •• Date of the delivery.
    • •• The contract ́s value.
    • •• Reference person/gender neutral preferred at the contracting authority with contact data (telephone number and email address) and a statement of the person in question ́s role at the builder during the contract. The gender neutral preferred may be contacted in order to verify that the information in the form is correct. The contractor will be responsible for ensuring that the reference person is available.
    • •2. Completed form in chapter 2. E1 point 5.1.
  • Tenderers shall be certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Management), or The Eco-Lighthouse Scheme, with relevance to equivalent transport projects. Documentation requirement

    • •1. Certificate issued by an independent body that documents that the contractor is certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Managment) or The Environmental Lighthouse Scheme. The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries.
    • •2. Other documentation for equivalent environmental management measures will be accepted if the contractor is unable to obtain such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to the requested environment systems or standards. The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.
  • The contractor shall be certified in accordance with ISO 9001 (2015), of relevance for equivalent transport projects. Documentation requirement

    • •1. Certificate issued by an independent body that documents that the tenderer is certified in accordance with ISO 9001 (2015). The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries.
    • •2. Other documentation for equivalent quality assurance measures will be accepted if the contractor is unable to get such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to ISO 9001 (2015). The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen