Sandbrekkeveien residential centre shall be an institution with 15 resident rooms divided between two departments. A long term department with 9 rooms and a short-term department with 6 rooms, each of the departments shall have the accompanying outside areas.   The resident group will be persons who have a decision on 24 hour care in age groups 18-30 years. The resident group has severe functional declines due to mental challenges diagnosed with developmental disturbances, or autism spectrum disturbance with low function levels.   The building shall also include the necessary personnel facilities connected to the department and in the personnel base.   The outside area shall provide a sheltered patio for residents.    The site has a recently approved zoning plan from 2024. This is developed for a residential centre with 9 flats with associated personnel areas, as well as 8 ordinary rental residences. This concept has been adopted changed to what is the basis of this project. It must be expected that in the interaction phase one must consider, as well as seek dispensation from parts of this if this proves necessary.   For this turnkey contract, the builder has set a cost cap of NOK 83,053 million excluding VAT, both the contract ́s phases 1 and 2 shall be carried out within this cost cap.

Zeitplan

Veröffentlichung
17.11.26
Abgabefrist
15.01.27

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Erfüllungsort
Bergen, Deutschland
Vertragslaufzeit
25 Tage
E-Mail
hovedpostmottak@bergen.kommune.no
Telefon
+47 05556
Website
https://www.bergen.kommune.no/
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Registered in a trade register or company register.

    • •The tenderer is registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU
    • •suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
    • •Documentation requirement:
    • •Description of the requirement/documentation:
    • •The company shall be legally registered.
    • •Documentation requirement: It is not necessary to enclose documentation for companies that are registered in the Norwegian Register of Business Enterprises and the VAT register. The contracting authority will check the organisation number in the company ́s Artifik profile. Please note that it is the organisation number that is in the company ́s profile for this competition in Artifik that is checked.
    • •For companies that are not registered in the above mentioned register, tenderers must present a certificate or confirmation (equivalent company registration certificate) of registration in a trade or business register as prescribed by the law of the country where the company is established. Such a certificate shall not be issued more than six months before the tender deadline.
  • Economic and financial capacity

    • •Regarding any other economic and financial requirements that have been stated in the notice or in the procurement documents, the tenderer declares that:
    • •Documentation requirement:
    • •Description of the requirement/documentation:
    • •The company must have sufficient economic and financial capacity to implement the assignment. When assessing what is seen as sufficient economic and financial capacity for each assignment, emphasis will be put on the assignment ́s values, benefits, risks and duration. All the received and any obtained information will form the basis for an overall assessment of whether the qualification requirement is fulfilled.
    • •Documentation requirement for Norwegian companies: The contracting authority will check the company ́s financial situation itself from DFØ's eBevis and Proff Forvalt (https://forvalt.no/). (companies that have delivered accounts to the Brønnøysund Register Centre are registered through Proff Forvalt)
    • •Foreign companies: The company ́s last two auditor approved annual accounts. If information in the above sources is not correct or supplementary information is needed to highlight the company's economic and financial situation, this can be provided.
  • Technical and professional qualifications

    • •Only for public building and construction works: During the reference period the tenderer has carried out the following work of the requested type. The contracting authority can require up to five years experience and allow experience from the previous five years to be taken into consideration.
    • •Documentation requirement:
    • •Description of the requirement/documentation:
    • •The company shall have experience from relevant assignments.
    • •Relevant assignments means the construction project of the same complexity/degree of difficulty and extent/size as the turnkey contractor. Total contractor must have experience from interaction projects and from construction projects within institutions or residences for similar user groups as in Sandbrekkevegen. All reference assignments stated shall be completed. As completed, assignments will be seen as taken over by the builder.
    • •Documentation requirement: The company ́s relevant assignments from the last ten years, listed in the reference list template. It is not necessary to fulfil all the requirements in the same project. In cases where the company does not have the necessary qualifications, but relies on other suppliers to be qualified, equivalent documentation must be presented for them.
  • Certificates issued by independent bodies for quality assurance standards.

    • •Can tenderers submit certificates issued by independent bodies that document that the tenderer fulfils the stated quality assurance standards, including universal design requirements?
    • •Documentation requirement:
    • •Description of the requirement/documentation:
    • •The contracting authority requires that all tenderers have a quality management system in accordance with NS-EN ISO 9001:2015.
    • •Documentation requirement: Valid ISO-9001:2015 certificate. If a company does not have such a certificate, documentation shall be enclosed in the form of the company's quality handbook, alternatively a table of contents of the management system and an organisation chart showing the responsibilities of quality.

Zuschlagskriterien

  • Price

  • Environment - non-slip construction site

  • Environment - materials

  • In this procurement, the award criteria are combined with climate and environmental requirements in the requirement specification. The contracting authority has assessed the project ́s climate and environmental impact and concluded that it would be better to set requirements in this procurement rather than use the 30 percent award criteria, cf. the Public Procurement Act § 5b. The justification for this will be reviewed below. In accordance with the Public Procurement Act § 5b, the Contracting Authority shall, as a main rule, weight climate and environment considerations with at least 30 percent. In accordance with § 5b second paragraph of the third period, this weighting can be replaced with climate and environmental requirements in the requirement specification alone or combined with the award criteria with a lower weight than 30%, if this gives better climate or environmental effect, and the reasoning is stated in the procurement documents.   The following activities have been carried out to map the climate and environmental impact of the procurement

    • •Review of planned work and assessment of extent and environmental impact in consultation with internal climate and environmental adviser. Due to a price and design contest (build to cost), the choice of systems is up to the contractor. Assumptions have therefore been made for what could be climate and environmental impact.
    • •From the climate and environment analysis, these climate and environmental considerations have been identified:
    • •* Materials: particularly concrete for floors on the ground and foundations, vinyl, gypsum and plywood.
    • •* Energy in operation: Energy consumption for room heating, tap water, ventilation, lighting and equipment throughout the lifetime of the project.
    • •* Construction site including mass transport: The climate and environmental impact makes up 100% of the direct emissions to air, and affects the surrounding area with a significant amount of noise and particles for air.
    • •Priorities will be given to measures that limit the climate footprint for the above mentioned emission posts, through the use of requirements and award criteria.
    • •A mapping of the market through the EFU ́s ongoing and executed construction projects has been carried out in order to assess the level of ambition and cost, as well as obtain knowledge on what can be offered in the region.
    • •Based on the above mentioned analyses and activities, the following requirements and award criteria are set in the project.
    • •* Requirement for 10% lower energy consumption than TEK17 energy framework model.
    • •* Option for future retrofitting and expansion of solar panel installations (planning and physical measures).
    • •* Requirement for climate gas calculations.
    • •* Requirement for circularity analysis/index in accordance with FutureBuilt.
    • •* Requirement 90% source sorting (70% in TEK 17).
    • •* Requirement for emission free vehicles.
    • •* The objective of maximum waste quantities.
    • •* Requirement for low-emitting materials.
    • •* Requirements for the absence of environmental toxins.
    • •* Requirement for legally carved wood.
    • •* Requirement for discharge free building heating and drying.
    • •* Requirements to safeguard flora.
    • •* Requirement for 20% re-use of ventilation channels.
    • •* Requirement for 20% re-use of cable bridges/channels.
    • •Award criteria:
    • •* 5% Maximum CO2 emissions for materials, with emphasis on concrete.
    • •* 10% Maximum diesel quantities.
    • •EFU believes it is clear that these requirements provide better climate and environmental effect than 30 % weighting because:
    • •In this competition the contracting authority has chosen to have comprehensive requirements as to how the construction work is carried out, as well as systems that limit the climate and environmental impact of the building's lifetime. Using requirements that are considerably stricter than the minimum requirements in TEK 17, the Contracting Authority ensures that all tenderers fulfil all environmental requirements, and thus achieve better climate and environmental effect than if the tenderers have the freedom to fulfil one or several of the environmental requirements in their tender offer and where it had to be assessed as part of the tender evaluation.
    • •Furthermore, it is the entirety of fulfilment of these requirements that give the best climate and environmental effect in order to reduce the largest emission drivers in the construction project. The contracting authority therefore believes that it will be clearly better to combine requirements and award criteria in this procurement.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen