Digbeth (Tea Factory) - FIT OUT

Zuschlag erteilt am 30. Oktober 2025

  • Overbury Plc, London · 10.400.000 €
Auftraggeber
Veröffentlicht
30.10.2025
Bekanntmachungsart
Zuschlagsbekanntmachung
{'p': ['The requirement is summarised below:', 'The BBC are looking to appoint a contractor to carry out fit-out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox. Staff are expected to move from The Mailbox to The Tea Factory in 2027.', 'Stoford (with BAM) started redeveloping The Tea Factory from a derelict building to a Shell and Core office1 in January 2024. They are making good progress and expect to complete their works in late December 2025.', '1 As part of the Shell and Core, Stoford and BAM are also building the walls and lids to the Technical Rooms (i.e., Studios, Edit Suites, etc).', 'The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.', 'The fit-out is over four floors (Ground, 1, 2 and 3) with a plant area on the roof. The scope of fit-out works includes:', '•\tFinishes (including acoustics) to the Technical Rooms:', 'o\t8x Radio Studios.', 'o\t10x Edit Suites.', 'o\t1x TV Studio.', 'o\t1x TV Studio Gallery.', 'o\t1x Lecture Theatre.', 'o\t4x Apparatus Rooms.', '•\tConstruction of Radio Drama Studio and Control Room including a ‘Dead Room’.', '•\tConstruction of six meeting rooms with structural lids.', '•\tAll M&E to the floor plates and all rooms / spaces.', '•\tRaised access floor.', '•\tAcoustic finishes.', '•\tWall and floor finishes.', '•\tFF&E (excluding technical rooms).', 'Design of the works has been progressed to RIBA Stage 4 by BBC Workplace with support from the following consultants:', '•\tJ4 Projects\t\tProject Managers', '•\tMGAC\t\tCost Consultant', '•\tAWW\t\t\tArchitects', '•\tIDSR\t\t\tInterior Designers', '•\tCMB\t\t\tMEP Design', '•\tArup\t\t\tStructural Engineer', '•\tIon Acoustics\t\tAcousticians', 'The works will be procured under the JCT 2024 D&B Contract.', 'The BBC does not intend to novate the designers to the contractor; however, it may be acceptable for the contractor to directly appoint the designers if they (a) deem it to be beneficial for the project and (b) can demonstrate that any associated risks (e.g., conflicts of interest) can be mitigated.']}

Zeitplan

Veröffentlichung
30.10.25

Ausschreibung

Reichweite
EU-weit
Vergabeart
oth-mult
Erfüllungsort
London, Deutschland
E-Mail
no_reply@bbc.co.uk
Website
http://www.bbc.co.uk/supplying/

Eignungs- & Bewertungskriterien

KI-Kriterien-Analyse

Erfüllen Sie die Anforderungen?

KI-Analyse prüft Eignungskriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen