Noch 9 Tage

E02 Kløfta tunnel

Auftraggeber
Veröffentlicht
29.10.2026
Angebotsfrist
—
This competition is for contract E02 the Kløfta tunnel. Main quantities: The north side of the tunnel (the Alta side): * Expansion and preparation of mass depot at Garajokka * Road between the new bridge (E03) and tunnel. 500 m with Main Road H1 * One stop * Treatment Plant * Technical buildings Tunnel: * 4,200 meters of T9.5 tunnel. * Tunnel portals, T12.5 constant cross section * Three technical rooms/buildings * Turnaround The south side of the tunnel (Kautokeino side): * 1.7 km with main road H1 * One technical building

Zeitplan

Veröffentlichung
29.10.26
Teilnahmefrist
30.11.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Oslo, Deutschland
Vertragslaufzeit
15 Tage
E-Mail
firmapost@vegvesen.no
Telefon
+47 22073000
Website
https://www.vegvesen.no
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • The contractor ́s organisational and legal position.

    • •The contractor shall be a legally established company or consist of a community of contractors who are legally established companies.
    • •The requirement also applies to entities that the contractor will use, cf. point 4.1 in the tender documentation chapter B2.
    • •The contractor shall not be a unit affected by the ban in the sanctions regulations of Ukraine § 8n, nor should it rely on entities in violation of § 8n.
    • •Documentation requirements:
    • •1. Certificate from the Register of Business Enterprises or an equivalent certificate of statutory registration in the country where the contractor or the entities that jointly constitute the contractor, cf. point 4.2, are established, as well as an equivalent certificate for all entities that the contractor relies on to be qualified, cf. point 4.1.
    • •2. Completed table in E1 point 3.2, possibly completed points 3.3 and 3.4.
    • •3. A completed self-declaration on the relation to applicable sanctions law, cf. E1 point 3.6.
    • •1. Upon request from the contractor, the contractor shall document who are real right holders in the contractor, companies in the contractor's group or companies that the contractor has controlling ownership or authority in, companies that the contractor will use, contract partners and any other in the supplier chain, as well as information on who is the general manager, chairman and other senior employees at the contractor.
  • The Contractor's economic and financial capacity

    • •Tenderers shall have sufficient economic and financial capacity to fulfil the contract, and shall also fulfil the following requirements:
    • •1. Tenderers shall have equity of minimum NOK 90,000,000.
    • •2. Tenderers shall have an equity ratio of at least 10%.
    • •3. Tenderers shall have an average annual turnover of minimum NOK 400,000,000 in the last three financial years.
    • •Documentation requirements:
    • •1. The tenderer's annual financial statement, annual report and auditor's report for the last three years and recent information (quarterly accounts) that is of importance to the tenderer's fiscal numbers.
    • •2. A brief account of information on economic conditions or losses that are not documented elsewhere and which is required to be documented in accordance with Norwegian and/or international accounting standards. The account shall also include any events of significance that occurred after the last revised annual accounts.
    • •3. An overview of any recently executed, ongoing or pending tax or public reviews of the contractor's activities.
    • •4. Completed table in E1 point 4. If the contractor has a justifiable reason for not submitting the documentation that the Builder has required, he can document his economic and financial capacity by presenting any other document of relevance to the company's fiscal figures/finances and which the builder deems suitable. The contractor shall justify why he cannot present the documentation the builder has demanded.
  • The contractor ́s technical and professional qualifications.

    • •Tenderers shall have sufficient experience with management and execution of road projects of a relevant nature and degree of difficulty.
    • •The contractor shall, in addition, have sufficient experience of a relevant nature and degree of difficulty from the following central works:
    • •1. Tunnel works, including driving and securing.
    • •2. Electrical installations in tunnels.
    • •3. FAT- SAT testing and safety approval for tunnels.
    • •4. Road construction
    • •The contractor shall have experience from the execution of the central works as mentioned above. If the contractor only has experience from, for example, managing contractual partners, the contractor must rely on other entities that have the necessary experience from the execution of the relevant central works, see point 4.1.
    • •Documentation requirements:
    • •1.
    • •A list of up to 7 and not less than 3 contracts that the contractor has carried out or carry out during the last five years calculated from the deadline for submitting requests for participation in the competition. The minimum and maximum limit applies to the total number of reference projects, and is the same regardless of whether the tenderer fulfils the qualification requirement alone or relies on others to fulfil the qualification requirement. The listed reference projects shall together document fulfilment of the qualification requirement. The list shall, cf. the form included in E1 point 5.1, contain the following for each of the contracts:
    • •• Name of the recipient (contracting authority)
    • •• A description of what the contract work was like, including relevance to the qualification requirement.
    • •• What work was carried out by the contractor himself and what work was carried out by sub-suppliers.
    • •• Date of the delivery.
    • •• The contract ́s value.
    • •• Reference person/gender neutral preferred at the contracting authority with contact data (telephone number and email address) and a statement of the person in question ́s role at the contracting authority during the contract. The gender neutral preferred may be contacted in order to verify that the information in the form is correct. The contractor will be responsible for ensuring that the reference person is available.
    • •2.
    • •Completed form in E1 point 5.1.
  • Environmental Management System

    • •Tenderers shall be certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Management), or The Eco-Lighthouse Scheme, with relevance to equivalent transport projects.
    • •Documentation requirements:
    • •1. Certificate issued by an independent body that documents that the contractor is certified in accordance with ISO 14001 (2015), EMAS (EU Eco-Management and Audit Scheme for Environmental Managment) or The Environmental Lighthouse Scheme. The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries.
    • •2. Other documentation for equivalent environmental management measures will be accepted if the contractor is unable to obtain such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to the requested environment systems or standards. The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.
  • Quality Management System

    • •The contractor shall be certified in accordance with ISO 9001 (2015), of relevance for equivalent transport projects.
    • •Documentation requirements:
    • •1. Certificate issued by an independent body that documents that the tenderer is certified in accordance with ISO 9001 (2015). The independent body must be accredited by Norwegian accreditation or equivalent bodies in other EEA countries.
    • •2. Other documentation for equivalent quality assurance measures will be accepted if the contractor is unable to get such certificates by the deadline, and this is not due to the contractor himself. It is a prerequisite that the contractor documents that these measures are equivalent to ISO 9001 (2015). The contractor shall justify why he did not have the opportunity to receive such certificates by the deadline, and what this is due to.

Zuschlagskriterien

  • K1 Tender Sum

  • K2 Organisation and offered key personnel.

  • K3 Implementation of the assignment

  • K4: Taking care of the outer environment and reduction of greenhouse gas emissions in the project

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen