E24 Pumping stations and valve manholes 3 – The transfer plant (Kongshaugen treatment facility).

Die Angebotsfrist ist am 20. März 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓

Zuschlag erteilt am 08. Mai 2026

  • ACO ANLEGG AS, TENNFJORD · 30.003.844 €
Zur Zuschlagsbekanntmachung →
Auftraggeber
Veröffentlicht
27.01.2026
Angebotsfrist
20.03.2026
The contracting authority and the builder are Ålesund municipality and Sula municipality. Ålesund municipality is the contract party. Ålesund municipality and Sula municipality cooperate through the project "BLÅ – fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: - Cleaner fjord system - Legal system for sewage water - Sustainable solution for the futureThe new sewage treatment facility shall be built in rock and shall have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment plant to Kongshaugen via a comprehensive transfer system. The transfer facility will have approx. 34 km sewage pipelines and will contain 25 objects, including approx. 28 km submarine pipelines, 6 km pipelines over land, 3 valve houses/manholes and nine pump stations. The contract work for the construction of the transfer facility will be organised as nine parallel execution contracts. For a more detailed description of the other contracts see Part A - General part. The Builder shall now enter into contract with one contractor for the execution of contract E24 Pump stations and valve manholes 3, which is a part of the transfer facility to Kongshaugen reindeer treatment facility. The builder will enter into a contract that builds on the contract standard "NS 8405:2008 Norwegian Building and Construction Contract" for the execution.- Execution of ground and construction work at the following new pumping stations: 420 PA070 Sunde, 433 PA060 Hamnevika and 470 PA010 Langevåg.- Execution of ground and construction work at the following existing pumping station: 432 PA620 Flisnes.- Ground work, including refilling, road works/external place, foundation earth, water and sewage installations in the ground on site, cable trenches, green areas, etc. - Foundation and construction works, HVAC and electro. See the tender documentation part II for further information on the contents and extent of the procurement.

Zeitplan

Veröffentlichung
27.01.26
Fragenfrist
09.03.26
Abgabefrist
20.03.26
Öffnung
20.03.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Erfüllungsort
Ålesund, Deutschland
Vertragslaufzeit
29 Tage
KMU geeignet
Ja
E-Mail
saffa.galal@inventura.no
Telefon
+47 55134480
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • 9.3.2 Requirement for tax certificate Tenderers shall have their affairs in order with regarding the payment of taxes and duties. Documentation requirement

    • •Tax certificate not older than six months.
    • •calculated from the tender deadline. With tax certificate
    • •Means:
    • •Norwegian tenderers:
    • •The certificate must not be more than 6 months old.
    • •issued by the tax office via Altinn.
    • •Foreign tenderers:
    • •Equivalent certificates from their own country as
    • •shows that they have their tax and
    • •duty conditions. If the authorities
    • •in the relevant country does not issue such
    • •certificates, the tenderer shall submit
    • •a declaration which states that all
    • •taxes and duties have been paid.
    • •The declaration shall be approved and
    • •signed by the tenderer's
    • •financial director/person responsible for finance.
  • 9.3.3 Registration, authorisation, etc. The tenderer shall be a legally established Enterprise. Documentation requirement

    • •Norwegian tenderers:
    • •Completed tender form, in which
    • •company names and
    • •organisation number is given.
    • •The contracting authority will verify that the requirement
    • •are fulfilled through lookups in
    • •The Register of Business Enterprises. Norwegian companies
    • •therefore does not need to deliver
    • •documentation for this requirement out
    • •the completed tender form.
    • •Foreign tenderers:
    • •Documentation that shows that
    • •the tenderer is registered in
    • •a trade register or company register.
    • •in accordance with the law in the country where
    • •the tenderer is established.
  • 9.3.4 Economic and financial capacity requirements Tenderers shall have good economic and financial capacity to be able to carry out Contract. The financial capacity will be assessed on the basis of i.a. turnover, profit ratio, solidity, liquidity, credit rating and payment history. Documentation requirement

    • •The tenderer's annual accounts including notes
    • •with the board's and auditor's reports from the last
    • •three completed fiscal years (2022, 2023, and
    • •2024).
    • •The contracting authority reserves the right to.
    • •themselves obtain a credit rating.
  • 9.3.5 Technical and professional qualification requirements (experience) Tenderers shall have experience from relevant and comparable deliveries, i.e. > Delivery of prefabricated and Waterproof swamps > Delivery of a built-up shelter in frame work > Electrical installations > Laying of Water and Sewage pipelines The tenderer does not need to have carried out all the listed items in one and the same reference project, but the reference projects must together show the requested experience. The reference projects must be carried out by the tenderer himself or by a sub-supplier that shall carry out the relevant parts of Contract. In such case there must also be delivered documentation that the sub-contractor is a supporting company in accordance with the competition description point 9.3.1. Documentation requirement

    • •An overview of up to five (5) relevant and
    • •comparable deliveries that
    • •the tenderer and any supportive
    • •companies, have carried out during the last five (5)
    • •years, calculated from the tender deadline.
    • •The overview shall contain the following for each
    • •of the contracts:
    • •Name of the builder (contracting authority)
    • •Date of the delivery
    • •The contract ́s value
    • •Description of the contractual works
    • •expired, including the relevance seen
    • •against the qualification requirement.
    • •What work was carried out by
    • •the tenderer himself and what works
    • •that were carried out by sub-suppliers
    • •(contract helpers)
    • •This qualification requirement is to be documented
    • •through the completion of part I annex 3 -
    • •Reference descriptions.
    • •If the tenderer relies on other
    • •companies to fulfil parts of the
    • •the qualification requirement applies to the limitations on
    • •the number of reference projects combined for both
    • •the tenderer and the supporting company.
  • 9.3.5 Requirements for technical and professional qualifications (right to be responsible). Tenderers shall fulfil the requirements apply for declaring the right to be responsible for executing within the functions that shall be be taken care of, cf. CASE 10 chapters 9-11. Including Following

    • •&gt
    • •Enterprise classification 3 for responsible executor for
    • •water supply and sewage installations.
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •road and ground works
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •concrete structures cast on site
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •ventilation and climate installations
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •lifting devices
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •fire alarm installations
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •management system
    • •&gt
    • •Enterprise classification 2 for responsible executor for
    • •joinery work and wooden constructions
    • •Documentation requirement:
    • •The tenderer shall deliver the current central
    • •certification for the right to be responsible in the enterprise classifications.
    • •for the functions that shall be safeguarded or other
    • •documentation that shows that the tenderer
    • •fulfils the requirements for declaring
    • •right to be responsible in the enterprise classifications.
  • 9.3.6 Quality assurance system requirements The tenderer shall have a good and implemented quality assurance system. Documentation requirement

    • •A description of the tenderer's
    • •quality assurance measures. The description shall as
    • •as a minimum, contain information on how to
    • •the tenderer's quality assurance system is
    • •built up and implemented in the organisation,
    • •how assignments and responsibilities are divided,
    • •how management follow-up, and whether
    • •Revisions.
    • •If the tenderer is certified in accordance with
    • •to ISO 9001 or equivalent certifications, is
    • •sufficient to enclose a copy of a valid
    • •Certificate.

Zuschlagskriterien

  • Price

    • •The price will be assessed on the basis of the
    • •The total sum stated in the
    • •Summary of price-bearing items in
    • •the scope description.
    • •Documentation requirement:
    • •Completed price form (part II point F) and
    • •quantity description (part II point C.2).
    • •The prices shall be stated in NOK and excluding VAT.
    • •If there are deviations between the price form in part II - F
    • •The re-tender and the description of amounts in part
    • •II - C.2 Technical quantity description,
    • •the amount description goes before
    • •the price form.
  • Implementation of the assignments

    • •Under the award criteria
    • •'Implementation of the Assignment' will
    • •the contracting authority evaluate to what degree
    • •the contractor has a good, concrete and
    • •project adapted plan for implementation
    • •of the project, with a view to the following
    • •Points:
    • •&gt
    • •quality assurance in
    • •the project as a whole
    • •&gt
    • •Considerations to neighbours and surroundings
    • •&gt
    • •Routines and Measures to Safeguard
    • •SHA/HSE and outer environment (including noise)
    • •in the project as such and by the
    • •some locations
    • •&gt
    • •Routines and Measures to Ensure
    • •cleaning and tidiness of
    • •the construction area and access roads,
    • •i.a. considering that several
    • •actors are involved in the
    • •different locations
    • •&gt
    • •the Contractor's progress plan,
    • •including whether or not
    • •the contractor's plan to ensure
    • •progress is robust,
    • •feasible and effective.
    • •Start-up and
    • •completion date shall be
    • •in accordance with the specified construction start and
    • •end, cf. Part II E - Deadlines and
    • •day formulas.
    • •Documentation requirement:
    • •the contractor shall deliver the following:
    • •&gt
    • •See Part I annex 5 -
    • •Implementation of assignments for
    • •information on
    • •documentation requirements and
    • •page number constraint for
    • •Answer.
  • Organisation

    • •Under the award criteria "Organisation",
    • •the contracting authority to evaluate the following:
    • •1. The contractor ́s organisation of
    • •the assignment, including:
    • •&gt
    • •Whether the contractor
    • •have an organisation that
    • •is adapted to the project
    • •with clear roles and ready
    • •distribution of responsibilities
    • •&gt
    • •How the Contractor's
    • •organisation ensures that
    • •Work shall be carried out
    • •at four stations
    • •2. The relevant key personnel's
    • •formal competence and relevant
    • •experience from previous assignments.
    • •Key personnel means:
    • •Manager
    • •Site Manager
    • •Documentation requirement:
    • •The contractor shall deliver the following:
    • •Documentation for point 1:
    • •The Contractor ́s response to point 1.
    • •documented by a detailed description of Part 1
    • •In Annex 6 - Organisation.
    • •See annex 6 for information on
    • •documentation requirements and
    • •page number limitations for replying to
    • •point 1.
    • •Documentation for point 2:
    • •CVs for key personnel.
    • •This point is documented through
    • •supplementation of Part I annex 7 - CV for
    • •key personnel.
    • •Tenderers can use their own CV template.
    • •as long as the information
    • •requested in the contracting authority ́s CV template.
    • •come from the CV.
  • Climate and environment

    • •Under the award criteria 'Climate and environment'.
    • •the contracting authority will evaluate the following:
    • •1. Mass handling and
    • •transport of matter. Amongst other things,
    • •emphasis will be put on the
    • •the tenderer will reduce
    • •transport of matter in the project,
    • •have a short transport distance, if there is
    • •used environmentally friendly vehicles to
    • •transport the masses, as well as
    • •reuse/reuse of matter.
    • •2. The contractor ́s binding measures.
    • •to safeguard environmental considerations and
    • •reduce climate emissions in
    • •the contract period, for example,
    • •connected to products/materials and
    • •components, transportation,
    • •waste minimisation and re-use.
    • •3. Routines for reporting and
    • •follow-up of the offered climate and
    • •environmental measures to the builder.
    • •The Contracting Authority draws attention to the fact that
    • •tenderer's tenders are binding in
    • •the implementation of the contract, see Part II - B.2
    • •Special contract terms point 6.
    • •Documentation requirement:
    • •The contractor shall deliver the following:
    • •&gt
    • •documentation requirement is given.
    • •by Part I annex 8 - Climate and
    • •Environment.
    • •The Contractor's response to
    • •the award criteria is documented
    • •through the completion of annex 8.
    • •Responses to points 2 and 3 in
    • •the award criteria shall be on
    • •max. 3 A4 pages (font size)
    • •10 points or greater). See
    • •further details on
    • •page number limitations in annex 8.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen