E64 Machine and process 3 – The transfer plant (Konghaugen reindeer treatment plant) - Qualification phase

Zuschlag erteilt am 12. Juni 2026

  • AxFlow AS, OSLO · 12.764.254 €
Auftraggeber
Veröffentlicht
12.06.2026
Bekanntmachungsart
Zuschlagsbekanntmachung
Ålesund municipality and Sula municipality cooperate through the project "BLÅ – fjords for the future", to construct a new sewage treatment plant at Kongshaugen (Kvasnes) in Sula municipality. The aims in the project are as follows: Cleaner fjord systemLovlig system for sewage waterBærekraftig system for the futureIt new sewage treatment facility shall be built in rock and have sufficient treatment capacity to handle sewage water that shall be supplied from Sula municipality and Ålesund municipality. The facility is dimensioned for 69,000 person equivalents and it shall be designed as a secondary treatment facility. The new treatment facility shall replace seven existing treatment plants and some interceptors for sludge. The sewage water must therefore be pumped from the existing treatment plant to Kongshaugen via a comprehensive transfer system. The transfer facility will have approx. 34 km sewage pipelines and will contain 25 objects, including approx. 28 km submarine pipelines, 6 km pipelines over land, 3 valve houses/manholes and nine pump stations. The contract work for the construction of the transfer facility will be organised as nine parallel execution contracts. See Part A - General part for a more detailed description of the other contracts. The builder shall now enter into a contract with one contractor for the delivery of machinery and process 3 for the transfer facility (contract E64), as a part of the transfer facility to Kongshaugen reindeer installations. The builder will enter into a contract that builds on the contract standard "NS 8405:2008 Norwegian Building and Construction Contract" for the execution. The contract includes, among other things, the delivery and assembly/installation of the following equipment: Process pipe Pumps Valves Measuring equipment, the contract includes delivery to four sewage pump stations: PA010 Langevåg, a new place building station with a capacity of 40 l/s.PA060 Hamnevika, a new place building station with a capacity of 45 - 80 l/s, designed for co-operation with the existing station PA605. PA070 Sunde, a new space building station with a capacity of 35 l/s PA620 Flisnes, which is an existing station where pumps etc. shall be replaced for pumping to PA060. All stations shall be equipped with 2 dry-line pumps above sump and vacuum installations. All stations except PA620 shall have special steel pipe installations for air cancellation and regular pigging. Construction engineering work, HVAC, electro, ground work and external water and sewage, including the pump sump, are included in another contract (E24). See the tender documents part II for further information on the procurement ́s content and extent.

Zeitplan

Veröffentlichung
12.06.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Ålesund, Deutschland
E-Mail
saffa.galal@inventura.no
Telefon
+47 55134480
Website
https://alesund.kommune.no/

Eignungs- & Bewertungskriterien

Zuschlagskriterien

  • Price

    • The price will be assessed on the basis of the total sum stated in the summary of price-bearing items in the quantity description. Documentation requirement: Completed price form (part II point F) and quantity description (part II point C.2). The prices shall be stated in NOK and excluding VAT. If there are deviations between the price form in part II - F
    • The re-tender E64 and the quantity description in part II – C.2 Technical quantity description.
    • E64, the description of amounts will go before the price form.
  • Quality

    • A general assessment will be made of how the tenderer will ensure good
    • quality of the delivery, in which the following elements will be emphasised:
    • 1. Choice and composition of the offered equipment as stated in Part I annex 6 -
    • Choice and composition of offered equipment.
    • Particular emphasis will be put on the main pumps ́ suitability as per capacity, suction ability, adjustability, blocked safety and service friendliness.
    • 2. The key personnel ́s relevant formal competence and relevant experience from previous assignments: As key personnel are seen as:
    • - Project Manager
    • - Site Manager
    • - Welding responsible
    • Documentation requirement: 1. The documentation requirement for point 1 is in Part I Annex 6 - Choice and composition of the offered equipment. Responses to point 1 shall be documented in Part I annex 6 - Choice and composition of the offered equipment.
    • The response of point 1 shall be at a maximum of 4 A4 pages (font size 10 or greater) altogether. Anything beyond four pages will not be evaluated, with the exception of product data sheets that shall be delivered in addition to allowed pages.
    • 2. CVs for key personnel.
    • CVs are documented by a supplementary part I annex 7 - CVs for key personnel.
    • Tenderers can use a separate CV template for as long as the information requested in the contracting authority ́s CV template is in the CV.
  • Climate and environment

    • The contracting authority will evaluate the following under the award criteria "Climate and environment":
    • 1. Binding climate and environmental choices that contribute to reducing greenhouse gas emissions and ensuring that the project is carried out without undesired environmental impact.
    • 2. The energy efficiency of offered pumps, as stated in Part I annex 8 - Climate and environment.
    • The contracting authority draws attention to the fact that the tenderer ́s response is binding in the execution of the contract, see Part II - B.2 Special contract terms point 5.
    • Documentation requirement: The tenderer shall submit the following: The documentation requirement for both point 1 and point 2 is in Part I Annex 8 - Climate and Environment. The award criteria can be documented by filling in Annex 8.
    • The page number limitations stated in Part I annex 8 - Climate and Environment apply for responses to point 1. Anything beyond the stated number of allowed pages will not be evaluated.
    • Point 2 shall be answered by filling in the table in annex 8 point 2.
    • Epd environmental declaration and/or environmental labelling can be submitted in addition to the allowed pages in Part I annex 8 - Climate and Environment.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Präsentation89 KB12 Seiten
Vertragsbedingungen42 KB24 Seiten
Vertragsentwurf287 KB4 Seiten
Kalkulation124 KB2 Tabellen
+ 4 weitere Dokumente

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vollständige Vergabeunterlagen herunterladen
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 1.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen