Veröffentlichung 13.11.26 | Fragenfrist 20.11.26 | Abgabefrist 26.11.26 | Vertragsbeginn 08.12.26 |
Eignungskriterien
A core directive of Gas Safe Technical Bulletin 163 is that any bespoke or specialist flue system designed to operate under positive pressure conditions (such as commercial CHP units, data centre generator exhausts, and modern condensing boiler cascades) must undergo a physical pressure test prior to commissioning to verify the physical integrity of the joints and ensure leakage stays within acceptable limits. Provide a design compliant with BS EN 13384. Commission system to BS EN 15287. To include a positive pressure test where the flue is P1 pressure or above. (This will be the case in the majority of projects). Leakage rates to be less than the maximum permissible listed in IGE UP/10. Provide pressure test result certificate. Supply and fit flue notice plate, including the designation of flue as described by BS EN 1443. Construction & Materials
Welche davon erfüllen Sie?
KI prüft alle Kriterien gegen Ihr Unternehmensprofil
Kostenlos · Sofortige Analyse
Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.
Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.
KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.
Vertraut von 2.000+ Unternehmen
Nie wieder passende Ausschreibungen verpassen
Aktuelle Ausschreibungen aus derselben Branche, täglich aktualisiert