Frist abgelaufen

Procurement - Fire station, 2026

Die Angebotsfrist ist am 19. Juni 2026 abgelaufen. Das Verfahren befindet sich in der Zuschlags- bzw. Abschlussphase. Ähnliche aktuelle Ausschreibungen ansehen ↓
Auftraggeber
Veröffentlicht
21.05.2026
Angebotsfrist
—
The aim of the procurement is to enter into a contract with one tenderer for a turnkey contract for the construction of a new fire station at Lerstadveien 525 in Ålesund (previously Bertel O. Steen). The project partly includes new buildings and partly renovation and reuse of the existing buildings. A new exit for turn-out vehicles shall be established. The turnkey contract will include several disciplines. The contract is planned for autumn 2026, provided that the contract is awarded and it is signed, cf. Part 0, point 2.1.3. The construction start is planned for week 8 2027, with completion in week 49 2028.

Zeitplan

Veröffentlichung
21.05.26
Fragenfrist
10.06.26
Teilnahmefrist
19.06.26
Vertragsbeginn
25.09.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Ålesund, Deutschland
E-Mail
ingunn.fladmark@alesund.kommune.no
Telefon
+47 70 16 20 00
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

    • •Tenderers are registered in a professional register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU
    • •suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
    • •Tenderers are registered in a company register or a trade register in the member state in which the tenderer is established. As described in annex XI of directive 2014/24/EU
    • •suppliers from certain member states may have to fulfil other requirements in the mentioned annex.
  • Is it necessary to have specific authorisation from a particular organisation in order to provide the service in the tenderer ́s home country?

  • Is it necessary to have a particular membership in a particular organisation in order to provide the service in the tenderer ́s home country?

  • For goods or services that are complicated, or that in exceptional cases shall be used for a particular purpose: Will the tenderer allow checks of the tenderer's production capacity or technical capacity and, where necessary, of the survey and research facilities that the tenderer has at its disposal and of quality control measures? The inspections shall be undertaken by the contracting authority or the contracting authority can leave it to a competent public body in the country where the tenderer is established.

  • Procurement of goods: The tenderer presents supplies that shall be delivered, requested samples, descriptions or photographs, which do not need to be accompanied by certificates that they are genuine.

Zuschlagskriterien

  • Price

    • •Orientation:
    • •Tenderers shall fill in the attached price form in their cost calculations, Part II annex F.1 Price Form and submit it as an annex to the tender in Excel format. All fields in the attached price form marked with yellow shall be completed. Missing the price fields can cause difficulties in assessing the tender and the tender can then be rejected.
    • •All prices are in NOK, excluding VAT, including all direct or indirect expenses and duties that could be incurred in connection with the delivery. Order fees and invoice fees are to be seen as expenses. The prices shall include all costs for the customer who is included in this competition. Costs that the tenderer knows will be incurred, but that are not specifically stated in the tender, will be seen as included in the stated costs.
    • •Evaluation:
    • •The total sum from the price form will form the basis of the price evaluation. This also includes options that are priced in the price form. This applies with the exception of an option for facilitating for future expansion of the office area, see annex C.2.6 Option 15.
    • •When assessing the price, a hybrid model with break point 1 will be used. The attached template for the evaluation model is attached: "Part I Annex T.1 Template - Evaluation Award Criteria Price".
    • •The tenderer ́s total points for this award criteria is weighted with the award criteria ́s weighting percentage.
  • Environment

    • •When evaluating, there will be a procuremental total assessment of the described systems. The achieved point score will be multiplied by the weighting of the tenderer.
    • •Orientation:
    • •The contracting authority would like to reduce greenhouse gas emissions connected to the use of concrete and would like to optimise for use of low carbon concrete class A, alternatively class B, in accordance with The Norwegian Concrete Association ́s definitions.
    • •Tenderers shall document the offered solution by stating the share of low carbon concrete of the total concrete volume, divided between class A and class B.
    • •The documentation shall as a minimum contain:
    • •percentage of unclassified concrete, low carbon concrete class A and class B.
    • •Description of the basis for the estimates.
    • •The tenderer shall use the annex "Part I Annex T.2 Miljo".
    • •The stated solution will be seen as binding for the implementation of the contract. The contracting authority reserves the right to check the documentation during the contract period.
    • •During the contract period the tenderer shall be able to document which low carbon class was actually delivered. The documentation shall be verifiable and it can include product documentation (EPD or equivalent), delivery documentation from the concrete supplier and the invoice documentation. Invoices shall be sufficiently specified to state which concrete class was delivered and that it has been delivered for this project. The contracting authority reserves the right to check the documentation during the contract period.
    • •Evaluation:
    • •The criteria will be assessed based on the calculated equivalent share of low carbon concrete of the total concrete volume.
    • •The following calculation will form the basis of the calculation:
    • •Low carbon concrete class A: 100 %
    • •Low carbon concrete class B: 50 %
    • •Unclassified concrete: 0 %
    • •Points scale
    • •Calculation example:
    • •40% class A and 40% class B
    • •→ 40% + (40% × 0.5) = 60% = 8 points
    • •Missing or incomplete completion of the documentation in accordance with the description above, can result in 0 points.
  • 10

    • •Orientation:
    • •Under this criteria, the contracting authority will assess the competence and experience of the offered key personnel who shall be used in the execution of the assignment.
    • •A completed competence form shall be submitted for the following key personnel:
    • •Manager
    • •engineering design manager
    • •ITB Responsible
    • •ITB responsible for managing and following up integrated technical building installations so that technical systems are engineered, executed, tested and documented as a combined and functional system, in accordance with NS 3935:2019. The role shall also include operative follow-up and coordination of technical disciplines in the turnkey contract, including both engineering design services and execution at the construction site.
    • •The stated key personnel will be seen as binding for the delivery. Replacement can only be done after written approval from the contracting authority. Any new personnel shall have at least as good competence and experience as the original offered.
    • •The tenderer shall use "Part I Annex T.3 Competence Form Personnel". Key personnel shall state a maximum of three reference projects that the key personnel have participated in in the last ten years. The competence form shall be completed and a brief description shall be given of the project (maximum 50 words), as well as a brief description of the role and work that the offered key personnel have performed (maximum 100 words).
    • •NB! The description shall not exceed 50 and 100 words per project. If the word limit is exceeded, only the first of the 50 and 100 words will form the basis for the assessment. The contracting authority will only assess the first three reference projects that are given per key personnel. Reference projects beyond this, as well as text beyond the word limitation, will not be considered.
    • •Evaluation:
    • •This award criteria will be assessed based on the tenderer ́s description of the award criteria. A total procurement assessment of the described system will be carried out during the evaluation. Particular emphasis will be put on the key personnel ́s:
    • •number of years with professional experience and experience in the offered role.
    • •experience from comparable projects, of which a positive weight will be given if references can be made to several relevant reference projects (maximum three).
    • •Best solution will be awarded the highest score (10). Other solutions will be awarded a point score relative to the best solution.
    • •The tenderer ́s total points for this award criteria is weighted with the award criteria ́s weighting percentage.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen ähnlicher Ausschreibungen

Die Frist dieser Vergabe ist abgelaufen.

Bei laufenden und zukünftigen Ausschreibungen wie dieser erhalten Sie die Vergabeunterlagen mit BidFix direkt: Passende Vergaben werden automatisch gefunden, Unterlagen und Kriterien-Analyse liegen in Ihrem Konto, bevor der Wettbewerb reagiert.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Ähnliche aktive Ausschreibungen

Laufende Verfahren mit offener Frist aus derselben Branche bzw. Region.

Alle neuesten →

Nie wieder passende Ausschreibungen verpassen