Project 1250901 AHO - Ventilation and ENØK K201 Turnkey contract

Auftraggeber
Veröffentlicht
06.11.2026
Angebotsfrist
04.01.2027
The Directorate of Public Construction and Property [Statsbygg) requests, in connection with project: no.: 1250901 name: AHO – Ventilation and ENØK tenders for a turnkey contract for replacing and upgrading the ventilation system as well as the implementation of energy efficiency measures (ENØK) at the Oslo School of Architecture and Design (AHO) in Oslo. The aim is to improve the indoor climate, operational security and energy efficiency in the existing teaching and administration building. The contracting authority is the Ministry of Education and Research at Statsbygg. The building is approx. 15,700 m2 and is located in Maridalsveien 29 in the centre of Oslo. A site inspection will be held for all tenderers 25.11.26, 08:00, at Maridalsveien 29, 0175 Oslo.

Zeitplan

Veröffentlichung
06.11.26
Abgabefrist
04.01.27

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Erfüllungsort
Oslo, Deutschland
Vertragslaufzeit
48 Tage
E-Mail
postmottak@statsbygg.no
Telefon
+47 22954000
Website
https://statsbygg.no

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Economic and financial capacity

    • •Tenderers are required to have satisfactory financial implementation ability.
    • •The size of the turnover, seen in relation to the contract value, can be emphasised.
    • •Documentation requirements:
    • •The Directorate of Public Construction and Property will carry out a credit rating of tenderers.
    • •Tenderers may, in addition, be asked to submit auditor confirmed annual accounts, alternatively state StartBANK ID.
  • Organisational and legal position

    • •Tenderers are required to have a legally established company.
    • •Documentation requirements:
  • Technical and professional qualifications

    • •For contractor:
    • •Tenderers are required to have considerable experience from assignments with responsibility for/responsibility for administering assignments with comparative value.
    • •A transferable value means experience with rehabilitation.
    • •For engineering designers:
    • •Tenderers are required to have sufficient experience from assignments with comparative value.
    • •Documentation requirements:
    • •Tenderers shall submit a description (up to one A4 page per project) of up to 5 reference projects in the last 5 years, with a justified transferable value. (projects older than 5 years may be emphasised).
    • •For designers: If the company/companies that shall design is different from the executing turnkey contractor (or if the reference projects for the contractor are not turnkey contracts where the executing turnkey contractor has designed), the engineering design company/companies that shall carry out the engineering design services for riaut and RIV shall document up to 3 reference projects with a transferable value in the last three years with information as stated below.
    • •General for contractors and designers:
    • •The reference projects shall include information on, among other things:
    • •·                     project name and location
    • •·                     the contracting authority
    • •·                     the project ́s size in m2 and the total cost
    • •·                     type of buildings
    • •·                     the assignment ́s contract value excluding VAT.
    • •·                     type of contract (if this is a turnkey contract, if own employees or sub-contractors have planned the project)
    • •·                     the company ́s assignments/role in the project
    • •·                     the start-up date and completion date (year) / if not completed - where one is in the project
    • •The engineering designer shall also provide information on what phases the assignment was carried out.

Zuschlagskriterien

  • Price

  • Exercise comprehension

  • Competence and experience for offered personnel. Experience with renovation (especially buildings with listed status), buildings in use, ventilation and automation will particularly be emphasised

  • Justification for use of the Norwegian Confederation of Trade Regulations § 5 b second paragraph of the third period. This procurement is for Ventilation and ECOX on the AHO. The most important climate footprint and environmental impacts in this procurement are

    • •·     Climate gas emissions and resource use connected to the use of new materials.
    • •·     Climate gas emissions connected to energy use in the operation of AHO.
    • •·     The generation of waste from the alterations of AHO.
    • •Concrete environmental requirements have been set in the competition in order to reduce the procurement ́s total climate footprint and environmental impact. It has been estimated that these requirements will give a better climate and environmental effect than the use of climate and environment as the award criterion.
    • •In order to reduce climate gas emissions and the use of resources connected to new materials, re-use assessments have been made and described the use of parts of the ventilation installations and windows. Emission requirements have also been set for the most commonly used and emission intensive materials in the procurement. These are best practice level from the latest edition of Green Building Alliance's Green Material Guide.
    • •Passive house standards are required for new ventilation systems and windows in order to reduce greenhouse gas emissions connected to energy use.
    • •In order to prevent emissions from waste generation, a high degree of sorting of all waste is required. Re-use assessments have also been made and re-use are required, as described above. The discarded windowed glass shall be recycled and not a landfill site.
    • •Statsbygg has assessed that the potential for further climate and environmental gains through a competition for award criteria is limited. This is because the requirements are set at the best practice level, both for materials and energy, as given by The Green Building Alliance and NS3701 (the passive house standard). An award criteria will therefore, to a small degree, be expected to provide better climate and environmental performance than the stipulated minimum requirements.
    • •Based on this, the terms for utilising the provision in the Norwegian Public Procurement Regulations § 5 b second paragraph of the third period are being assessed as fulfilled. Statsbygg is therefore exempted from the obligation to weight climate and the environment with a minimum of 30 percent or prioritise this among the three highest weighted award criteria.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen