Noch 49 Tage

Turnkey contract - New Vikersund School

Auftraggeber
Veröffentlicht
26.11.2026
Angebotsfrist
15.01.2027
Modum municipality intends to award a turnkey contract for the new Vikersund school, project number 020660. The contract work comprises design and construction in two phases: Phase 1: A new school building for a two-form entry primary school of approx. 4,750 m² gross floor area, constructed as an extension of the sports building currently under construction on the site, and development of the outdoor area closest to the school building. Phase 2: Demolition of the existing buildings, with the exception of the Blue department building (avdeling Blå), and development of a car park, a bus bay area and a new outdoor area. The school will remain in operation throughout the construction period. The turnkey contractor shall take over the client's contracts with the architect and the fire safety consultant. The contract is based on NS 8407:2011, and the procurement is not divided into lots. The contracting authority will hold an information meeting and a site visit, see the procurement documents, sections 1.6 and 2.5.

Zeitplan

Veröffentlichung
26.11.26
Abgabefrist
15.01.27
Vertragsbeginn
26.02.27

Ausschreibung

Reichweite
EU-weit
Vergabeart
Offenes Verfahren
Erfüllungsort
Vikersund, Deutschland
E-Mail
post@modum.kommune.no
Telefon
+47 32789300
Website
https://www.modum.kommune.no/
In Maps öffnen

Eignungs- & Bewertungskriterien

Eignungskriterien

  • Legally established company

    • •The tenderer shall be a legally established company.
    • •Documentation requirement:
    • •Norwegian tenderers are to enclose a company registration certificate.
    • •Foreign tenderers shall enclose confirmation that the tenderer is registered in a company register, professional register or trade register in the country where the tenderer is established.
  • Tax and VAT certificate

    • •Tenderers shall enclose a tax and VAT certificate, cf. the Procurement Act § 5l. This requirement applies to Norwegian tenderers.
    • •Documentation requirement:
    • •Tax and VAT certificate, ordered in Altinn.
    • •The certificate shall not be older than six months, calculated from the day the contracting authority gives the choice of tenderer.
    • •Tenderers are encouraged to enclose the certificate in the tender.
  • Economic and financial capacity to perform the contract

    • •Tenderers must have sufficient economic and financial capacity to fulfil the contract. The tenderer shall, as a minimum, have:
    • •* A credit rating of level A or better at Proff Forvalt
    • •* An average annual turnover of at least NOK 180 million for the last two fiscal years.
    • •Documentation requirement:
    • •The contracting authority will obtain a credit rating from Proff Forvalt, based on the last known accounting figures.
    • •The contracting authority can obtain annual accounts and other documentation if necessary to assess the requirement.
    • •If the tenderer has a justifiable reason for not documenting the requirement in this way, the tenderer can present other documentation that the contracting authority deems suitable.
    • •The tenderer confirms in the tender letter that the tenderer has the financial capacity to fulfil the contract, and provides any support from other entities.
  • Experience from turnkey contracts of a similar nature, scope and complexity to this contract

    • •Tenderers shall have experience from turnkey contracts of an equivalent nature, scope and complexity to this contract.
    • •Tenderers shall at least have executed a turnkey contract for purpose-built buildings, with a contract value of at least NOK 80 million excluding VAT, taken over in the last five years.
    • •Purpose-built buildings means schools, nurseries, health and welfare buildings, sports buildings, office buildings and equivalent buildings for public purposes.
    • •Documentation requirement:
    • •Description of up to three reference projects. Each project is to be given:
    • •* project name, type of building and gross area
    • •* the contracting authority, with a gender neutral preferred, telephone number and email address.
    • •* contract value excluding VAT and contract form.
    • •* start-up and take-over date
    • •* the tenderer's role and own services
    • •* the project ́s relevance for this contract
    • •The tenderer is responsible for substantiate relevance through the description. The contracting authority can contact the stated contact persons.
    • •Tenderers can document their experience through the competence of personnel that the tenderer has at his disposal and can use the assignment, even when the experience has been developed by another tenderer.
  • Quality assurance system

    • •Tenderers shall have a quality assurance system that covers the engineering design services and execution.
    • •Documentation requirement:
    • •Valid certificate in accordance with ISO 9001 or equivalent, issued by an independent body.
    • •Alternatively a statement of up to two A4 pages for the tenderer ́s quality assurance system, with a table of contents for the system.
  • Environmental management system

    • •Tenderers shall have an environmental management system that covers the execution of the contract.
    • •Documentation requirement:
    • •Valid certificate in accordance with ISO 14001, Miljøfyrtårn, EMAS or equivalent, issued by an independent body.
    • •Alternatively a statement of up to two A4 pages for the tenderer ́s environmental management measures, with routines for waste, energy, transport and emissions at the construction site.

Zuschlagskriterien

  • Price

  • Proposed solution

  • Assignment-specific competence

  • The contracting authority has set climate and environmental requirements in the requirement specifications instead of emphasising climate and the environment by 30 percent in the award, cf. the Procurement Act § 5b second paragraph. The requirements are in annex C Book 0 chapter 13 and annex C7 Environmental Follow-up Plan. They include, among other things

    • •* At least 30 percent reduction in greenhouse gas emissions from materials, measured against DFØ ́s reference value for school buildings (25 percent if the option for the steel supporting system is triggered).
    • •* at least 20 percent lower net energy need than the energy limit in the Building Engineering Regulations and energy label A
    • •* emission free heating at the construction site
    • •* At least 90 percent source sorting and a maximum of 30 kg waste per m², except demolition waste
    • •The contracting authority has set high environmental targets for the project and prepared an environmental follow-up plan that the turnkey contractor shall follow, cf. annex C Book 0 point 13.1. The contracting authority considers climate gas emissions from materials and the building's energy requirements as the largest climate and environmental impacts in the procurement. The requirements are obligatory for all tenderers and will ensure the effect regardless of which tender is chosen. The contracting authority considers them to be significant in order to achieve lower climate and environmental impact and considers that they are therefore not suitable as award criteria. An award criteria would be paid for differences between the tenders, without ensuring the same level in the tender chosen.
    • •Provisional calculations with the described minimum requirements for materials provide approx. 20 percent reduction in greenhouse gas emissions, while the requirement is 30 percent, cf. annex C Book 0 point 13.3. It is the turnkey contractor ́s task to choose which materials need to be changed in order to reach the requirement. The achievement shall be documented in the finished building with climate gas accounts and energy labels. The tenderer ́s plan to fulfil the environmental requirements is also assessed under the award criteria "Løsningsforslag", cf. point 5.2.2.
    • •The contracting authority considers, on this basis, that the requirements give better climate and environmental effect than using climate and the environment as the award criteria with 30 percent weight.

Welche davon erfüllen Sie?

KI prüft alle Kriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Lose (1)

Vergabeunterlagen

Die Vergabeunterlagen zu dieser Ausschreibung sind noch nicht in BidFix hinterlegt.

Mit einem kostenlosen Konto verfolgt BidFix diese Vergabe für Sie: Die Unterlagen erscheinen in Ihrem Konto, sobald sie verfügbar sind, inklusive Kriterien-Analyse und Fristen-Überwachung.

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vergabeunterlagen neuer Ausschreibungen direkt im Konto
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 2.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen