FAIR_Power Converters for SIS100 Extraction Septum Magnets 2 and 3

Auftraggeber
Veröffentlicht
07.05.2026
Angebotsfrist
A new international scientific research centre facility FAIR (Facility for Antiprotons and Ion Research) is under constructed next to the existing GSI Helmholtz Centre for Heavy Ion Research. FAIR will provide antiproton and ion beams of unprecedented intensity and quality. One of the essential parts of FAIR will be the Heavy Ion Synchrotron (SIS)100. High current Extraction Septa 2 and 3 magnets are components of the SIS100, which will be powered by 2 power converters. The current in the magnets must be ramped up to 13000 A with an absolute accuracy of 100 ppm. The maximum output voltage is of up to 100V. These power converters will be feed by 20kV supply system. In Table 4.1 of the Detailed Specification, ANNEX 3, the specified maximum available installation space for the power converters is to be understood as a preliminary guideline. Deviations from this requirement may be acceptable under certain circumstances and can be discussed during the negotiation phase, if necessary.

Zeitplan

Veröffentlichung
07.05.26

Ausschreibung

Reichweite
EU-weit
Vergabeart
neg-w-call
Erfüllungsort
Darmstadt, Deutschland
Vertragslaufzeit
16 Tage

Lose (1)

Interessiert an dieser Ausschreibung?

Melden Sie sich kostenlos an und erhalten Sie automatische Benachrichtigungen für ähnliche Ausschreibungen mit KI-gestützter Analyse.

Tägliche E-Mail mit passenden Ausschreibungen
KI-Analyse der Vergabeunterlagen
Anforderungen & Fristen auf einen Blick
Entscheider & Ansprechpartner finden
Jetzt kostenlos registrierenKeine Kreditkarte erforderlich