The Fehmarnbelt Fixed Link Project is the final stage in the realization of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt between Rødbyhavn on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. The Tunnel Track and Catenary (‘TTC’) contract covers design, build (installation), testing and commissioning of the tunnel track and catenary (overhead contact line ('OCL')) systems.
Lose (1)
Interessiert an dieser Ausschreibung?
Melden Sie sich kostenlos an und erhalten Sie automatische Benachrichtigungen für ähnliche Ausschreibungen mit KI-gestützter Analyse.