Veröffentlichung 30.06.26 |
Zuschlagskriterien
Price: Consideration of the price through the valuation method "Bestangebots-Quotienten-Methode"
Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.): To determine the most economically advantageous bidder, the contracting authority enters the total score achieved based on the technical evaluation. Only bids with a technical score of at least 500 points are considered. Technical bids with fewer points are rejected as technically unsuitable.
Erreichte Gesamtpunktzahl nach fachlicher Wertung (inkl. Mindbed.): To determine the most economically advantageous bidder, the contracting authority enters the total score achieved based on the technical evaluation. Only bids with a technical score of at least 500 points are considered. Technical bids with fewer points are rejected as technically unsuitable.
Welche davon erfüllen Sie?
KI prüft alle Kriterien gegen Ihr Unternehmensprofil
Kostenlos · Sofortige Analyse
KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.
Vertraut von 1.000+ Unternehmen
Nie wieder passende Ausschreibungen verpassen