Noch 20 Tage

ELECTROLYTE RECOVERY AND LIFETIME CONTROL - EXPRO PLUS

Auftraggeber
Veröffentlicht
20.04.2026
Angebotsfrist
11.09.2026
To minimise salt loss, to optimise salt stability and to enable salt regeneration/purification for themolten salt electrolysis process.DescriptionThe Fray Farthing Chen (FFC) Cambridge process and similar Molten Salt Electrolysis (MSE)processes, including the Regolith to OXYgen and Metals Conversion (ROXY) process, are potentialgame changing approaches to making resources available in alunar environment, i.e. the oxygenand metals which are chemically bound to lunar and planetary regolith/ bedrock.To operate an MSE based In-Situ Resource Utilization (ISRU) process on planetary surfaces, withthe minimum need of resupply of consumables, the salt/electrolyte recovery, stability andregeneration are of utmost importance for the sustainability of the in-situ process.To successfully apply this process for ISRU, essential aspects to be understood include: the saltrecovery from the porous reduced feed stockmaterial, as well as the salt regeneration/purificationfrom processing immanent contaminants, and from degradation products. Thesefactors are key toachieving a long-term stable process for a prospected stationary production, which is furtherchallenged with the cost and opportunities for resupply of important process.The activity includes the following tasks:- Consolidate the electrolyteconservation and energy requirements, considering existingknowledge on the electrolyte stability.- Perform a trade-off of the most promising aspects of electrolyte reclamation and purificationfor a range of MSE processes- Select the most appropriatetechnological approaches (e.g. distillation, regenerationtechniques from a gas, liquid solid)- Design an integrated electrolytereclamationand purification system into a molten saltelectrolysis process, accounting for adequate material selection and method to activelypump/exchange the salt during the process- Manufacture a salt recovery breadboard system that is integrated with a MSE cell- Characterise and optimise the recovery process using the breadboard testing and validation.

Zeitplan

Veröffentlichung
20.04.26
Abgabefrist
11.09.26

Eignungs- & Bewertungskriterien

KI-Kriterien-Analyse

Erfüllen Sie die Anforderungen?

KI-Analyse prüft Eignungskriterien gegen Ihr Unternehmensprofil

Kostenlos · Sofortige Analyse

Vergabeunterlagen

Eigenerklärung78 KB32 Seiten
Eignungskriterien37 KB6 Seiten
Preisblatt203 KB2 Tabellen
Projektplan89 KB24 Seiten
+ 14 weitere Dokumente

Nie wieder passende Ausschreibungen verpassen

KI findet täglich passende Aufträge für Sie – basierend auf dieser Ausschreibung.

Vollständige Vergabeunterlagen herunterladen
KI-Analyse der Eignungskriterien
Ähnliche Ausschreibungen automatisch erhalten
Wettbewerbsanalyse und Markteinblicke
Kostenlos · Keine Kreditkarte

Vertraut von 1.000+ Unternehmen

JobRadRecareDigit 4 U

Nie wieder passende Ausschreibungen verpassen